Atzwanger
Headquarter
Pichler Architects
Iron Minuet
The new Atzwanger establishment in Bolzano Sud is the result of a clear formal synthesis including total respect for the latest seismic regulations, a modelling of highly technological materials (such as aluminium and glass) with a strong architectural identity.In this brief cinematographic story, The Piranesi Experience captures the true essence of the continuous dance between solids and void, between iron and glass, which like a minuet, alternate in the facade without ever predominating one over the other, rendering the entire complex harmonious and balanced.
The short film opens with the camera almost motionless, alluding to the steadiness and stability of the building, showing us an encasement from a strong valance both functional and aesthetic, whose structure is the outcome of an in-depth study of the functions for which it is designed.
Entering the building, the camera moves fluidly and we notice the repetition of the serial metal structure, formed by a regular mesh that structures and marks the spaces into multiplicable and adaptable modules according to the needs of the company.
We return to the exterior of the building, now solely illuminated by artificial light, which principally marks out and affirms the relationship between full capacity and emptied portions in the prospectus: an arm-wrestle without a winner.
Rossana Vinci, architect and journalist
Client:
Atzwanger spa
Category:
Architecture
Key facts
Area: 2.890 sq.m.
Max height: 23,5 m
Key facts structures
Office: 120 tProd
Production: 330 t
Facades
Office
- window frames: 650 sq.m.
- transom mullion: 320 sq.m.
- alucobond facade: 950 sq.m.
- external cover for logo: 310 sq.m.
Production
- industrial facade: 2.520 sq.m.
Cover
Production
- cover: flat 580 sq.m.
- cover: shed 2.100 sq.m.
Timing
Start and end our project: 27.10.10 - 03.07.12